All:
I am using WO2X flow for the DLI switch to control my power supplies and a Flex 6600 radio remotely.? The Flex requires that the power supply for the radio be turned on 2 to 3 minutes prior to turning on the radio and the power supply should wait to turn off 2 to 3 minutes after the radio is turned off to be turned off.? I am looking for help to add to the WO2X flow two buttons/switches that will sequence the on/off of the radio and supply with the proper delay.? Thanks for any help - 73,
Dave - K9UK