The section with the loading dock.? :)
All pictures here if you want to follow the construction
/
---
Jerry Durand, Durand Interstellar, Inc. +1 408 356-3886
&
toggle quoted message
Show quoted text
So.....you didn't get a pic of the important part of the new house.......
;)
Bill
-----Original Message-----
From: [email protected] [mailto:[email protected]] On Behalf Of Jerry Durand
Sent: Thursday, April 23, 2020 6:28 PM
To: [email protected]
Subject: Re: [4x6bandsaw] Corona lockdown challenge
I got a short break here to work on getting rid of stuff here, but now
our house contractors are back to work with a special work permit.? This
leads to things like the late night DING DING DING on my phone, they
need an updated drawing for something NOW.? Problem being half a world
away from the construction site.
On the plus side, it's coming along nicely.
On the other hand, just got the electrician's bill.? Their base price is
for one outlet per room.? I blew past that even in the pantry!? :)? But,
this is a top-rated electrical contractor so it will be done right.
The main part of our project at the link below.? The machine shop is a 1
story section off the right edge of the picture.
On 4/23/20 5:18 PM, Terry Coombs wrote:
? I don't really need another stand for the bandsaw , but I do need a
log dragging device to pull behind my yard tractor ... problem is that
my work load didn't change because of the virus . The still under
construction house still needs work , bees need tending , garden takes
up some time too . Then there are all those trees out there that have
been marked for firewood for next winter . A country boy can survive ,
but it's a lot of work !