Looking for climbing help
Good afternoon,
I've got a rooftop 6m beam that I need to remount, and could really use some help, because I'm unable to do the climb. I barely got the old rotor removed, but my fear of heights and falling got me. It's a garage roof, one story, tripod mount, 5 feet of mast, rotor, then another 5 feet of mast and the 6m3. It just needs to be dropped in the rotor, tightened up, and a grounding wire replaced. I'm willing to pay, not looking for a freebie here. Hell, if someone's got access to a bucket truck, that might work too... :) Pat -- Pat in Lewisville '19 FLSB '97 XLH 883 (Rocinante) BS#140 K0OOK EKIII rides with me |
Pat, how steep is the roof pitch? Robert Henley On Saturday, May 30, 2020 Patrick St. Jean <[email protected]> wrote: Good afternoon, I've got a rooftop 6m beam that I need to remount, and could really use some help, because I'm unable to do the climb. I barely got the old rotor removed, but my fear of heights and falling got me. It's a garage roof, one story, tripod mount, 5 feet of mast, rotor, then another 5 feet of mast and the 6m3. It just needs to be dropped in the rotor, tightened up, and a grounding wire replaced. I'm willing to pay, not looking for a freebie here. Hell, if someone's got access to a bucket truck, that might work too... :) Pat -- Pat in Lewisville? ? ? ? ? ? '19 FLSB? ? ? ? ? ? '97 XLH 883 (Rocinante) BS#140? ? ? ? ? ? ? ? ? ? ? K0OOK? ? ? ? ? ? ? ? ? EKIII rides with me ? ? ? ? ? ? ? ? ? |
¿ªÔÆÌåÓýI¡¯d estimate it¡¯s a 30-35 degree pitch. The bad part is that the rotor is at eye level, so the beam needs to be lifted overhead. I¡¯m about ready to rent a personnel lift. Which is killing me because that¡¯s the cost of the concrete base for a crank up tower. :(Pat On May 30, 2020, at 18:02, Robert Henley via groups.io <rhenley01@...> wrote:
|
Pat if you are comfortable, give me an address or phone number and I will contact you. On Sunday, May 31, 2020 Patrick St. Jean <[email protected]> wrote: I¡¯d estimate it¡¯s a 30-35 degree pitch. The bad part is that the rotor is at eye level, so the beam needs to be lifted overhead. I¡¯m about ready to rent a personnel lift. Which is killing me because that¡¯s the cost of the concrete base for a crank up tower. :( Pat On May 30, 2020, at 18:02, Robert Henley via groups.io <rhenley01@...> wrote:
|