Keyboard Shortcuts
ctrl + shift + ? :
Show all keyboard shortcuts
ctrl + g :
Navigate to a group
ctrl + shift + f :
Find
ctrl + / :
Quick actions
esc to dismiss
Likes
Search
Re: 82 Repeater Work Plan
Thanks Stacy! Hopefully our roofing subject matter expert can weigh in on needed materials. Not sure who that is yet :) We took a trip up to the 82 site with new AGM batteries and a programmable MPPT controller. Existing batteries were all at 0.0 volts.? With new batteries installed and controller installed, I missed a crucial change in the wiring color standard on the load side of the solar controller. Long story short, I let the magic smoke out of several?components of the repeater. I did everything I could to follow the wiring and check polarity at each junction but missed at one spot. We have hauled all the equipment back down to be looked over.? I will work on cleaning up and standardizing the wiring, making it very easy for anyone to decipher and diagnose with fuse blocks, connectorized disconnects and coherent colors. Hopefully our electronics guru Harley can find something easy to repair and we can get the system back to the top of the mountain before the road is impassable?on wheels. Thanks to Dan for transportation services and to Norm for his company and extra set of hands. I am very sorry to have created additional issues at this site, but I do believe that when we are finished, the 82 will be better and more?reliable than ever. -Trevor KG7KCV On Sun, Sep 15, 2024 at 12:30?PM Stacy KK7CJV via <stroscoe2001=[email protected]> wrote:
|
to navigate to use esc to dismiss