开云体育

ctrl + shift + ? for shortcuts
© 2025 Groups.io

May Camp


 

Can you believe it’s less than a week away before the start of May Camp?! Well, I certainly can, and I better start packing.

It’s shaping up to be a great camp with not two, not three, but FOUR tasks on hand to keep everyone busy. Leading off we will of course have the always popular Lint Crew led by Linda and Pam. We will continue our work in El Ghor/Silliman moving the now much beloved transformer parts. In addition, our work on George’s Path will continue and we also now have approval to start working from the other side and removing concrete. I know, I had the same thought, “I love concrete!”. Lastly, we have been informed that some local hooligans have tagged an area of Cedar Sink so I will take a small torch brigade to see if we can’t burn it off.

We will be staying at Maple Springs and hopefully the weather will cooperate for the much-anticipated burn off between Dave and Chuck! We will be continuing the Saturday night potluck dinner as this has been a great way to hang out and catch up with our resto family. If you are in the area and looking for something to do Saturday night, bring a dish and join us for dinner. We plan on starting around 6ish.

Can’t wait to see you all.

Brian


 

开云体育

Sounds like a great weekend. I plan on arriving Thursday afternoon. Hoping that we have good weather.?

Pam


On Apr 28, 2024, at 8:10?PM, Brian <macarestocamp@...> wrote:

?

Can you believe it’s less than a week away before the start of May Camp?! Well, I certainly can, and I better start packing.

It’s shaping up to be a great camp with not two, not three, but FOUR tasks on hand to keep everyone busy. Leading off we will of course have the always popular Lint Crew led by Linda and Pam. We will continue our work in El Ghor/Silliman moving the now much beloved transformer parts. In addition, our work on George’s Path will continue and we also now have approval to start working from the other side and removing concrete. I know, I had the same thought, “I love concrete!”. Lastly, we have been informed that some local hooligans have tagged an area of Cedar Sink so I will take a small torch brigade to see if we can’t burn it off.

We will be staying at Maple Springs and hopefully the weather will cooperate for the much-anticipated burn off between Dave and Chuck! We will be continuing the Saturday night potluck dinner as this has been a great way to hang out and catch up with our resto family. If you are in the area and looking for something to do Saturday night, bring a dish and join us for dinner. We plan on starting around 6ish.

Can’t wait to see you all.

Brian


 

Sounds great Brian and all!

I am recovering well, but it apparently takes 6-8 weeks to heal up. So don't have a thoracotomy/lobectomy recreationally. I am really curious to see how the excavation near the elevator goes. I can offer encouragement from the peanut gallery.?

Should I bring the two by six for carrying panels? Can't recall the best rig with it so let me know if clamps and slings are needed.

Best, Rick?

Oh, I hung lanterns on either side of my calendar. They go well together.

On Sun, Apr 28, 2024, 8:10?PM Brian via <macarestocamp=[email protected]> wrote:

Can you believe it’s less than a week away before the start of May Camp?! Well, I certainly can, and I better start packing.

It’s shaping up to be a great camp with not two, not three, but FOUR tasks on hand to keep everyone busy. Leading off we will of course have the always popular Lint Crew led by Linda and Pam. We will continue our work in El Ghor/Silliman moving the now much beloved transformer parts. In addition, our work on George’s Path will continue and we also now have approval to start working from the other side and removing concrete. I know, I had the same thought, “I love concrete!”. Lastly, we have been informed that some local hooligans have tagged an area of Cedar Sink so I will take a small torch brigade to see if we can’t burn it off.

We will be staying at Maple Springs and hopefully the weather will cooperate for the much-anticipated burn off between Dave and Chuck! We will be continuing the Saturday night potluck dinner as this has been a great way to hang out and catch up with our resto family. If you are in the area and looking for something to do Saturday night, bring a dish and join us for dinner. We plan on starting around 6ish.

Can’t wait to see you all.

Brian


 

开云体育

heart Thomas, Amy E reacted to your message:

From: [email protected] <[email protected]> on behalf of Rick Olson via groups.io <rickardolson16@...>
Sent: Monday, April 29, 2024 4:23:20 PM
To: [email protected] <[email protected]>
Subject: [EXTERNAL] Re: [MACAresto] May Camp
?

?

?This email has been received from outside of DOI -?Use caution before clicking on links, opening attachments, or responding.??



Sounds great Brian and all!

I am recovering well, but it apparently takes 6-8 weeks to heal up. So don't have a thoracotomy/lobectomy recreationally. I am really curious to see how the excavation near the elevator goes. I can offer encouragement from the peanut gallery.?

Should I bring the two by six for carrying panels? Can't recall the best rig with it so let me know if clamps and slings are needed.

Best, Rick?

Oh, I hung lanterns on either side of my calendar. They go well together.

On Sun, Apr 28, 2024, 8:10?PM Brian via <macarestocamp=[email protected]> wrote:

Can you believe it’s less than a week away before the start of May Camp?! Well, I certainly can, and I better start packing.

It’s shaping up to be a great camp with not two, not three, but FOUR tasks on hand to keep everyone busy. Leading off we will of course have the always popular Lint Crew led by Linda and Pam. We will continue our work in El Ghor/Silliman moving the now much beloved transformer parts. In addition, our work on George’s Path will continue and we also now have approval to start working from the other side and removing concrete. I know, I had the same thought, “I love concrete!”. Lastly, we have been informed that some local hooligans have tagged an area of Cedar Sink so I will take a small torch brigade to see if we can’t burn it off.

We will be staying at Maple Springs and hopefully the weather will cooperate for the much-anticipated burn off between Dave and Chuck! We will be continuing the Saturday night potluck dinner as this has been a great way to hang out and catch up with our resto family. If you are in the area and looking for something to do Saturday night, bring a dish and join us for dinner. We plan on starting around 6ish.

Can’t wait to see you all.

Brian


 

开云体育

Rick, I think the 2x6 clamps and slings would be valuable. And we will be sure to get you all the latest pictures, news, and gossip from the excavation!

Brian?



On Apr 29, 2024, at 11:23?AM, Rick Olson via groups.io <rickardolson16@...> wrote:

?
Sounds great Brian and all!

I am recovering well, but it apparently takes 6-8 weeks to heal up. So don't have a thoracotomy/lobectomy recreationally. I am really curious to see how the excavation near the elevator goes. I can offer encouragement from the peanut gallery.?

Should I bring the two by six for carrying panels? Can't recall the best rig with it so let me know if clamps and slings are needed.

Best, Rick?

Oh, I hung lanterns on either side of my calendar. They go well together.

On Sun, Apr 28, 2024, 8:10?PM Brian via <macarestocamp=[email protected]> wrote:

Can you believe it’s less than a week away before the start of May Camp?! Well, I certainly can, and I better start packing.

It’s shaping up to be a great camp with not two, not three, but FOUR tasks on hand to keep everyone busy. Leading off we will of course have the always popular Lint Crew led by Linda and Pam. We will continue our work in El Ghor/Silliman moving the now much beloved transformer parts. In addition, our work on George’s Path will continue and we also now have approval to start working from the other side and removing concrete. I know, I had the same thought, “I love concrete!”. Lastly, we have been informed that some local hooligans have tagged an area of Cedar Sink so I will take a small torch brigade to see if we can’t burn it off.

We will be staying at Maple Springs and hopefully the weather will cooperate for the much-anticipated burn off between Dave and Chuck! We will be continuing the Saturday night potluck dinner as this has been a great way to hang out and catch up with our resto family. If you are in the area and looking for something to do Saturday night, bring a dish and join us for dinner. We plan on starting around 6ish.

Can’t wait to see you all.

Brian

<PXL_20240329_190830549.jpg>


 

OK, I will bring them. I can help with graffiti remediation too.??


On Mon, Apr 29, 2024, 11:41?AM Brian via <macarestocamp=[email protected]> wrote:
Rick, I think the 2x6 clamps and slings would be valuable. And we will be sure to get you all the latest pictures, news, and gossip from the excavation!

Brian?



On Apr 29, 2024, at 11:23?AM, Rick Olson via <rickardolson16=[email protected]> wrote:

?
Sounds great Brian and all!

I am recovering well, but it apparently takes 6-8 weeks to heal up. So don't have a thoracotomy/lobectomy recreationally. I am really curious to see how the excavation near the elevator goes. I can offer encouragement from the peanut gallery.?

Should I bring the two by six for carrying panels? Can't recall the best rig with it so let me know if clamps and slings are needed.

Best, Rick?

Oh, I hung lanterns on either side of my calendar. They go well together.

On Sun, Apr 28, 2024, 8:10?PM Brian via <macarestocamp=[email protected]> wrote:

Can you believe it’s less than a week away before the start of May Camp?! Well, I certainly can, and I better start packing.

It’s shaping up to be a great camp with not two, not three, but FOUR tasks on hand to keep everyone busy. Leading off we will of course have the always popular Lint Crew led by Linda and Pam. We will continue our work in El Ghor/Silliman moving the now much beloved transformer parts. In addition, our work on George’s Path will continue and we also now have approval to start working from the other side and removing concrete. I know, I had the same thought, “I love concrete!”. Lastly, we have been informed that some local hooligans have tagged an area of Cedar Sink so I will take a small torch brigade to see if we can’t burn it off.

We will be staying at Maple Springs and hopefully the weather will cooperate for the much-anticipated burn off between Dave and Chuck! We will be continuing the Saturday night potluck dinner as this has been a great way to hang out and catch up with our resto family. If you are in the area and looking for something to do Saturday night, bring a dish and join us for dinner. We plan on starting around 6ish.

Can’t wait to see you all.

Brian

<PXL_20240329_190830549.jpg>


 

开云体育

Great news, looking forward to catching up.


On Apr 29, 2024, at 7:56?PM, Rick Olson via groups.io <rickardolson16@...> wrote:

?
OK, I will bring them. I can help with graffiti remediation too.??

On Mon, Apr 29, 2024, 11:41?AM Brian via <macarestocamp=[email protected]> wrote:
Rick, I think the 2x6 clamps and slings would be valuable. And we will be sure to get you all the latest pictures, news, and gossip from the excavation!

Brian?



On Apr 29, 2024, at 11:23?AM, Rick Olson via <rickardolson16=[email protected]> wrote:

?
Sounds great Brian and all!

I am recovering well, but it apparently takes 6-8 weeks to heal up. So don't have a thoracotomy/lobectomy recreationally. I am really curious to see how the excavation near the elevator goes. I can offer encouragement from the peanut gallery.?

Should I bring the two by six for carrying panels? Can't recall the best rig with it so let me know if clamps and slings are needed.

Best, Rick?

Oh, I hung lanterns on either side of my calendar. They go well together.

On Sun, Apr 28, 2024, 8:10?PM Brian via <macarestocamp=[email protected]> wrote:

Can you believe it’s less than a week away before the start of May Camp?! Well, I certainly can, and I better start packing.

It’s shaping up to be a great camp with not two, not three, but FOUR tasks on hand to keep everyone busy. Leading off we will of course have the always popular Lint Crew led by Linda and Pam. We will continue our work in El Ghor/Silliman moving the now much beloved transformer parts. In addition, our work on George’s Path will continue and we also now have approval to start working from the other side and removing concrete. I know, I had the same thought, “I love concrete!”. Lastly, we have been informed that some local hooligans have tagged an area of Cedar Sink so I will take a small torch brigade to see if we can’t burn it off.

We will be staying at Maple Springs and hopefully the weather will cooperate for the much-anticipated burn off between Dave and Chuck! We will be continuing the Saturday night potluck dinner as this has been a great way to hang out and catch up with our resto family. If you are in the area and looking for something to do Saturday night, bring a dish and join us for dinner. We plan on starting around 6ish.

Can’t wait to see you all.

Brian

<PXL_20240329_190830549.jpg>